Project Period | 8 months (2009-2010) | 10 months (2013-2014) |
Project Area | 1050m2 | 2400m2 |
In the facility development works carried out as two separate projects, prefabricated structure, conventional building and steel construction applications were applied. In the turnkey project, all parts were harmonized with each other and fabricated.