Project Period | 6 months |
Project Area | 2000m2 |
The production facility construction project was a turnkey project. In practice, conventional, prefabricated and steel construction works were manufactured by ensuring their harmony with each other.
Project Period | 6 months |
Project Area | 2000m2 |
The production facility construction project was a turnkey project. In practice, conventional, prefabricated and steel construction works were manufactured by ensuring their harmony with each other.