Project Period 6 months
Project Area 1750m2

 

Within the scope of facility development works, the existing building was reinforced with steel construction. In addition, the required administrative building was constructed on a turnkey basis, including landscaping.

  • Company: Ilgınlar
  • Date: 2007
  • Category: Industrial
  • Location: İzmir Torbalı