Project Period | Ongoing Project |
Project Area | 3000m2 |
Started in 2023, the prefabricated production facility construction project is being built on turnkey basis.
Project Period | Ongoing Project |
Project Area | 3000m2 |
Started in 2023, the prefabricated production facility construction project is being built on turnkey basis.